Heterogeneous iodine cluster formation has been identified as the responsible factor resulting in large iodine titration requirements for Boeing's first high Mach number nitrogen ejector nozzle. A solution employing geometrically produced aerodynamic heating in the flow was envisioned to break up these clusters. Horizontal and vertical wire arrays (cluster busters) placed downstream of the nozzle exit plane (NEP) have been shown to significantly reduce the optimal iodine titration and to greatly improve the power extraction efficiency of the Chemical Oxygen-Iodine Laser utilizing this first generation ejector nozzle.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.