Paper
27 July 2016 Status of the Transneptunian Automated Occultation Survey (TAOS II)
Matthew J. Lehner, Shiang-Yu Wang, Mauricio Reyes-Ruiz, Charles Alcock, Joel Castro, Wen-Ping Chen, You-Hua Chu, Kem H. Cook, Liliana Figueroa, John C. Geary, Chung-Kai Huang, Dae-Won Kim, Timothy Norton, Andrew Szentgyorgyi, Wei-Ling Yen, Zhi-Wei Zhang
Author Affiliations +
Abstract
The Transneptunian Automated Occultation Survey (TAOS II) will aim to detect occultations of stars by small (~1 km diameter) objects in the Kuiper Belt and beyond. Such events are very rare (< 10−3 events per star per year) and short in duration (~200 ms), so many stars must be monitored at a high readout cadence. TAOS II will operate three 1.3 meter telescopes at the Observatorio Astronómico Nacional at San Pedro Mártir in Baja California, México. With a 2.3 square degree field of view and a high speed camera comprising CMOS imagers, the survey will monitor 10,000 stars simultaneously with all three telescopes at a readout cadence of 20 Hz. Construction of the site began in the fall of 2013, and the survey will begin in the summer of 2017.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Matthew J. Lehner, Shiang-Yu Wang, Mauricio Reyes-Ruiz, Charles Alcock, Joel Castro, Wen-Ping Chen, You-Hua Chu, Kem H. Cook, Liliana Figueroa, John C. Geary, Chung-Kai Huang, Dae-Won Kim, Timothy Norton, Andrew Szentgyorgyi, Wei-Ling Yen, and Zhi-Wei Zhang "Status of the Transneptunian Automated Occultation Survey (TAOS II)", Proc. SPIE 9906, Ground-based and Airborne Telescopes VI, 99065M (27 July 2016); https://doi.org/10.1117/12.2232203
Lens.org Logo
CITATIONS
Cited by 6 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Stars

Space telescopes

Signal to noise ratio

Diffraction

Cameras

Scanning probe microscopy

RELATED CONTENT

The TOLIMAN space telescope
Proceedings of SPIE (July 09 2018)
Astrometric sky testing results for the TIS 5 micron 3T...
Proceedings of SPIE (September 17 2007)
Guide, focus/alignment system for BigBOSS
Proceedings of SPIE (September 13 2012)
Improving the Signal to Noise Ratio in Hard X Ray...
Proceedings of SPIE (July 14 1986)

Back to Top