24 July 2014 Making the CHARA Array, Part III: engineering decisions. to build or not to build
Author Affiliations +
Abstract
The CHARA Array has been a PI led, low budget, and low manpower operation, and has followed a fairly unconventional path in its development. In this, the third paper of a series of three, we discuss some of the engineering and design decisions made along the way, some right and some wrong, with a focus on the choice between in-house development and the purchase of pre-built, or sub-contracted, subsystems. Along with these issues we will also address a few parts of the system that we might have done differently given our current knowledge, and those that somehow turned out very well.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Theo A. ten Brummelaar, Harold A. McAlister, and Stephen Ridgway "Making the CHARA Array, Part III: engineering decisions. to build or not to build", Proc. SPIE 9146, Optical and Infrared Interferometry IV, 91460F (24 July 2014); https://doi.org/10.1117/12.2056653
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Control systems

Interferometers

Telescopes

Software development

Systems modeling

Actuators

Optical mounts

RELATED CONTENT


Back to Top