Paper
21 September 2012 Predicted JWST imaging performance
Author Affiliations +
Abstract
The James Webb Space Telescope optical telescope element mirror components, 18 individual primary mirror segment assemblies (PMSA), the secondary mirror (SM), tertiary mirror (TM), and Fine Steering Mirror, have all been fabricated. The performance of the optical telescope (OTE) based on the as-measured optical components is combined with alignment tolerances and the on-orbit alignment process to predict the imaging performance of JWST. The best estimate of the wavefront error, Strehl ratio and Encircled Energy stability is presented.
© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
J. Scott Knight, Paul Lightsey, and Allison Barto "Predicted JWST imaging performance", Proc. SPIE 8442, Space Telescopes and Instrumentation 2012: Optical, Infrared, and Millimeter Wave, 84422G (21 September 2012); https://doi.org/10.1117/12.926817
Lens.org Logo
CITATIONS
Cited by 5 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

Aerospace engineering

James Webb Space Telescope

Image quality

Wavefronts

Telescopes

Vignetting

RELATED CONTENT


Back to Top