Paper
12 July 2008 W. M. Keck Observatory operations
Author Affiliations +
Abstract
The operations model of the Keck Observatory and the factors that allow it to operate with unprecedented scientific success while maintaining the lowest operating cost to capital ratio of the 8m-10m class of telescopes are examined. We describe matching of resources to operating requirements and steps taken to optimize the effectiveness of the overall operation. We describe how strategic goals, operating philosophy and detailed planning mesh to match science objectives with technological capability. We conclude by examining how operations design drives both long term operating cost and realization of the potential inherent in the initial capital investment.
© (2008) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Hilton A. Lewis and Richard H. Matsuda "W. M. Keck Observatory operations", Proc. SPIE 7016, Observatory Operations: Strategies, Processes, and Systems II, 701603 (12 July 2008); https://doi.org/10.1117/12.786570
Lens.org Logo
CITATIONS
Cited by 1 scholarly publication.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Observatories

Phase modulation

Adaptive optics

Keck Observatory

Domes

Interferometers

Back to Top