Paper
20 July 2000 Completion of VLT and Gemini primary mirrors at REOSC
Marc Cayrel
Author Affiliations +
Abstract
In 1989 and 1994, REOSC was awarded contracts for the optical fabrication of the four VLT and two Gemini 8-m class primary mirrors, respectively. We elaborate on the mirror concepts and their optical specifications, and discuss the fabrication and testing methods applied to the production of these mirrors. We also provide an overview of the facilities and equipment designed and built to transport, handle and process the mirrors. All units have been completed well within requirements; we provide detailed insight into the results obtained with all mirrors, and demonstrate that very large, aspheric mirrors can be produced to utmost accuracy-- in practice, well below the diffraction limit.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Marc Cayrel "Completion of VLT and Gemini primary mirrors at REOSC", Proc. SPIE 4003, Optical Design, Materials, Fabrication, and Maintenance, (20 July 2000); https://doi.org/10.1117/12.391508
Lens.org Logo
CITATIONS
Cited by 2 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

Gemini Observatory

Polishing

Telescopes

Active optics

Wavefronts

Interferometry

RELATED CONTENT

Analysis of target wavefront error for secondary mirror of a...
Proceedings of SPIE (September 08 2014)
Gemini 8.2-m primary mirror no. 1 polishing
Proceedings of SPIE (August 25 1998)
Polishing and testing of the 1.5 m SiC M1 mirror...
Proceedings of SPIE (September 25 2008)
Progress of the OWL 100-m telescope conceptual design
Proceedings of SPIE (August 02 2000)
The active primary mirror assembly for the SOAR telescope
Proceedings of SPIE (September 28 2004)

Back to Top