The status of the Magellan Project is discussed in detail with overall planning, cost, and manpower. The progress of the manufacturing of various telescope components, the work on the site, and the preparation of contracts are described. In particular the enclosure, the buildings and the telescope mount are shown in detail. Present plans concerning the telescope control system and the future operation are mentioned.
© (1994) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Marinus J. de Jonge "Status of the Magellan Project", Proc. SPIE 2199, Advanced Technology Optical Telescopes V, (1 June 1994); https://doi.org/10.1117/12.176200
Lens.org Logo
CITATIONS
Cited by 6 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Mirrors

Space telescopes

Buildings

Control systems

Manufacturing

Observatories

RELATED CONTENT

Progress on the New York State Observatory a new...
Proceedings of SPIE (July 22 2014)
Progress report on the Magellan 8-m telescope project
Proceedings of SPIE (July 01 1990)
Assembly and integration to first light of the four VLT...
Proceedings of SPIE (August 02 2000)
Design of the Discovery Channel Telescope enclosure
Proceedings of SPIE (September 28 2004)
Mechanical concepts for 30-m class telescopes
Proceedings of SPIE (January 30 2003)

Back to Top